Design Criteria

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

CLIMATIC AND GEOGRAPHIC Table R301.2(1)

  • Energy Compliance: Zone 8 and Zone 9-anything north of Vista Del Rio
  • Rainfall Design: Based on 2" of rainfall per hour
  • Ground Snow Load: 0
  • Wind Design: Speed- 110mph (3 second gust)
  • Topographic Effects- C
  • Seismic Design Category: D-2
  • Weathering: Negligible
  • Frost Line Depth: 12"
  • Termite: Very Heavy
  • Winter Design Temp: 40
  • ICE Barrier Underlayment Required: No
  • Flood Zone: X
  • Community Panel #060645-0005A
  • Effective Date (Rev.) 1/11/2002
  • Air Freezing Index: 0
  • Mean Annual Temp: 60 degrees

STRUCTURAL DESIGN

  • Seismic Design Category:
  • Residential CRC: D subtext 0 or D subtext 1
  • Commercial CBC: D
  • Braced Walls
  • Residential CRC: 602.10
  • Commercial CBC: 2308.12
  • Residential Additions: Use 1500psf for soil bearing per CRC (table R401.4.1)